top of page
Customer:
PJSC "ArcelorMittal Kryvyi Rih"
Type of work:
Installation of pipelines, installation of shut-off valves, reinforcement of existing joints, manufacture and installation of fittings
Year of execution:
June 2018 - November 2018
Carrying out works on technical re-equipment of the water supply system, including installation of pipelines with a diameter of 219 to 1420 mm, installation of shut-off valves with a diameter of 200 to 1400 mm, strengthening of existing joints with a diameter of 1420 mm, manufacturing and installation of shaped parts (transitions, bends).
The work is performed with high quality, which ensures the reliability and efficiency of the water supply system.
bottom of page